Awards
 
 
New Energy Star Homes
Renovated Energy Star Homes

Renovated Energy
Star Homes

> Exterior Front
> Front Before
> Great Room 1
> Great Room 2
> Kitchen
> Solar Tube
> Mechanical Room
> Knee Wall Ducts

< Previous project   1  2  3  4  5  6  7   Next project >

A great deal of planning was required in order to install a high efficiency mechanical system that could be zoned to condition the full house without creating awkward soffits. The mechanical room was tucked into a small area beneath the roof that was ideally located in order to limit the length of the duct runs. A two-stage condensing furnace distributes conditioned air via a network of sheet metal ducting with all joints air-sealed with mastic.  In the lower right corner, you can see the energy recovery ventilator that provides filtered fresh air to the house. This is the ideal way to provide ventilation air efficiently to a house that has been air-sealed to eliminate unwanted air leakage and heat loss.

 
 
 
 

BPC Green Builders, LLC, 523 Danbury Road, Wilton, CT 06897-2233
phone: (203) 563-9909     fax: (203) 563-9912     info@bpcgreenbuilders.com     www.bpcgreenbuilders.com
Site Map   Copyright and legal    Site Developed and Hosted by Continuum Marketing Group LLC