Awards
 
 
New Energy Star Homes
Renovated Energy Star Homes

Renovated Energy
Star Homes

> Exterior Front
> Front Before
> Great Room 1
> Great Room 2
> Kitchen
> Solar Tube
> Mechanical Room
> Knee Wall Ducts

< Previous project   1  2  3  4  5  6  7   Next project >

Note that spray foam insulation has been installed in the roof rafter cavities only.  This allowed us to install a supply air duct in the knee wall area where it is entirely within the conditioned envelope.  Traditional insulating practice would be to insulate the short knee wall and the adjoining floor area under the roof, without insulating the rafter cavities themselves.  This practice typically results in significant air leakage, heat loss, wasted energy, and comfort problems.

 
 
 
 

BPC Green Builders, LLC, 523 Danbury Road, Wilton, CT 06897-2233
phone: (203) 563-9909     fax: (203) 563-9912     info@bpcgreenbuilders.com     www.bpcgreenbuilders.com
Site Map   Copyright and legal    Site Developed and Hosted by Continuum Marketing Group LLC